The Top Rebars remain unmeshed.

I am following a tutorial on ANSYS for RCC Beam.

https://www.youtube.com/watch?v=oOQ4_jIjHkE

But the problem is that the top rebars are behaving as an independent body and is not showing any sign of meshing.

As per the tutorial the rebar should behave as following:

But in my case the top rebars are showing no bonded behaviour. For Reference see the attached picture:


How can I solve the problem.

N.B: I used CEINTF to bond rebar and concrete as follows

/PERP7

CMSEL,S,NM_LongRebars,ELEM

CMSEL,A,NM_STR,ELEM

CMSEL,A,NM_TopRebars,ELEM

NSLE,S

CMSEL,S,NM_Concrete,ELEM

CEINTF,0.1

ALLSEL,ALL

/SOLU

Answers

Sign In or Register to comment.