Stress increase - share topology

Hi, I have problem with share topology.

I have a system of 2 plates clamped with a bolt. The top plate is a 2 parts component with sahre topology setup. The top board is a 2 parts component iwith the share topology setup. After the solution (fix support, bolt pretension, force) I have a significant stress peak on the share topology connection. How can i fix this problem?


Comments

Sign In or Register to comment.