Judy Cooper
Ansys Employee

Hi:

Unfortunately a variable timestep is what is generally used to run these types of problems, so the fixed option is unavailable.  Your best option is to set the initial and max step size the same and make both small enough that the timestep length is unlikely to fall below the level that is set.