peteroznewman
Subscriber

What do you mean by “stretching a part from a pipe”?

In this assembly, which part is being held fixed?  Where on that part is it being held?

In this assembly, which part is being pulled?  Where on that part is it being pulled?

How much stretching is being done? Where on the assembly does the break occur?

Please show the entire Force-Displacement plot from the pipe assembly test.

In the simulation, what is the significance of 200 kN? Why do you say that force in the simulation matches a force of 9,000 kN in the test?