Nikhil Narale
Ansys Employee

Hello, 

 

In the newer version, the option is replaced by the ‘Pseudo Time Method’ option, as can be seen in your screenshot. 

Check this: 32.14. Performing Calculations with a Pseudo Time Method (ansys.com)

If you are not able to access the link, refer to this forum discussion: Using Help with links (ansys.com)

 

Thank you