Hi
It is probably possible to do that to certain extent (depends on the final failure type to capture).
So we can ramp up the load gradually untill something fails say perhaps.
Search this forum and the internet you will find some examples:
https://forum.ansys.com/forums/topic/increasing-load-displacement-curve-in-joint-structure/
All the best
Erik