July 20, 2023 at 11:25 am
Ansys Employee
Hello,
It looks like you have added your Cable Winch to a stability analysis, where it can only act to maintain a constant cable tension. For a Cable Winch that changes the cable length, the Hydrodynamic Response Analysis Settings 'Computation Type' option needs to be set to 'Time Response Analysis'.
Generally, I would recommend that you run a stability analysis first (without the Cable Winch), and then link the Solution of this system to the Setup of a second Hydrodynamic Response system, which will be your time response analysis (including the Cable Winch). The stability analysis provides equilibrated initial conditions for the vessel, so avoiding any large forces/moments at the start of the time domain calculation.
I hope this helps!
Mike