HDLI
Ansys Employee

Hello Berker,

      There are many loops to run about 1000+, you spend lots of time to assign materials because you want to assign one by one.

      If you group them to assign materials like above, you do not need to run many loops that could save time.

      Do you have 1000+ different materials? If Yes, it is what it is, and there is no way to skip it.

HDLI