General Mechanical

General Mechanical

How to change the contact type from bonded to standard with change in load step?

    • nselvara
      Ansys Employee

      This can be done by modifying the key option. Use the following command to modify the key option: KEYMOD,ITYPE,KNUM,VALUE TYPE Element type number as defined on the ET command. KNUM Number of the KEYOPT to be defined (KEYOPT(KNUM)). VALUE Value of this KEYOPT. This is undocumented command. Sometime changing the key option abruptly can give wrong solutions, make sure that the results are correct

    • Vishal Ganore
      Ansys Employee

      How do you change the contact type from bonded to standard with change in load step?

Viewing 1 reply thread
  • You must be logged in to reply to this topic.